Island of Majorca Will Get Renewable Energy from Mainland Spain

EnergyRefuge.comPublished on Date September 23rd, 2011 by EnergyRefuge.com
Posted in Category Europe, Category Renewables
Tags1 Comment »
Rating: 5.0/5
advertisement

The popular Spanish holiday destination will clean up its energy mix with an underwater connection to the mainland.

Back in October 2007 Siemens announced on its website that its Power Transmission and Distribution (PTD) would connect the resort island of Majorca to the power grid on the Spanish mainland for the first time.

The feat would be done through a 155 mile-long, 250kV HVDC submarine cable linking the island to Morvedre, near Valencia. The cable would allow power transmission of 400 MW at a DC transmission voltage of 250 kV from May 2011.

Majorca is a very popular holiday destination during the summer, when it is visited by hordes of northern European tourists. The electricity imports from the European power grid will cover the island’s peak load requirements. And what’s better, with a good share of renewable energy.

Now the project has been inaugurated, according to a statement Siemens released two days ago.

The amount of power the HVDC link will transmit to Majorca (400 MW) correspond to around 25 per cent of the island’s installed power plant capacity that serves 860,000 people who live there and ten million tourists who visit it annually. 35 per cent of the mainland power mix is based on alternative energy, whereas Majorca’s installed generation is largely based on gas, coal and oil. Compared with the construction of an additional new power plant the link to the mainland will in the future reduce annual CO2 emissions by as much as 1.2 million tons, or roughly halve emission, Siemens said.

According to Siemens Energy CEO, Michael Suess, the project is part of a larger trend in Europe to create a super grid. “With our HVDC technology renewables-based power can be transmitted over long distances with low losses”, he said.

Siemens said that cables links longer than 80 kilometers are only possible with HVDC transmission technology. That is because for underground or submarine cables, hardly any electricity is delivered when AC lines are this length or longer, because the cable’s insulation serves as a capacitor and becomes charged, thereby absorbing the electricity.

The link laid to Mallorca comprises three single-piece submarine cables, which were supplied by the Italian cable specialist Prysmian together with the Norwegian cable manufacturer Nexans and laid at a depth of as much as 1485 meters on the Mediterranean seabed.

With overhead lines, HVDC reduces the transmission losses by between 30 and 50 percent. Given the same width of the cable run, 30 to 40 percent more energy can be transmitted than with conventional overhead lines carrying alternating current.

Article by Antonio Pasolini, a Brazilian writer and video art curator based in London, UK. He holds a BA in journalism and an MA in film and television.

Island of Majorca Will Get Renewable Energy from Mainland Spain, 5.0 out of 5 based on 1 rating
WP Greet Box icon
Welcome to the CleanTechies Blog! If you are new here, you might want to subscribe to the RSS feed or via email for updates on this topic.
Share and Bookmark:
  • RSS
  • email
  • Print
  • Digg
  • LinkedIn
  • Twitter
  • Facebook
  • del.icio.us
  • Mixx
  • Google Bookmarks
  • FriendFeed
  • Identi.ca
  • NewsVine
  • StumbleUpon
  • Technorati
  • Wikio
  • Yahoo! Buzz
  • PDF
VN:F [1.9.4_1102]
Rating: 5.0/5 (1 vote cast)


One Comment to “Island of Majorca Will Get Renewable Energy from Mainland Spain”

  • What an economic feat!!!!!!!!!!!
    Did any one check for alternate ways??

    Once an offshore wind farm is planned, then it is worth to investigate utilization of the offshore area to extract maximum energy.
    There is no comparable system on the market as to: Direct Drive energy extraction from Wave, Wind and Ebb/Tide, including Pitch and rotation directional control, all leading to direct energy conversion to electric power.
    The use of “Isosync” VSG generator by VSG-USA that runs at a wide range of speed, will not discard its load, will still continue to generate power of the same frequency and voltage as the utility line it is in parallel with. The “Isosync” VSG generator does this WITHOUT the use of complicated speed controls, power electronics or inverters. The “Isosync” VSG will harness power sources more efficiently or that otherwise could not be utilized with standard AC generators.
    The system provides modular construction, minimum moving parts, and highest efficiency, all leading to minimal construction, operation and maintenance costs.

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.

Additional comments powered by BackType

 
Vote Solar
Cleantech Law Partners
GRID Alternatives
      Home  |  About  |  Subscriptions  |  Advertise  |  Press  |  Affiliate  |  Contact  |  Terms of Use  |  Privacy Policy  |  Sitemap
      Copyright © 2008-2013 CleanTechies, Inc. - All rights reserved
Time needed to produce page: 1.080